Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

866.985.7624

New Mexico Electrical Residential & Commercial EE-98

 This license covers all electrical work, including work identified in less comprehensive electrical classifications, premises wiring systems 600 volts, nominal, or less, underground distribution raceway systems regardless of voltage, and wiring systems and terminations 600 volts, nominal, or less, with the exception of additional work identified under the EL-1 classification. May bid and contract as the prime contractor of an entire project provided the electrical contractorโ€™s portion of the contract, based on dollar amount, is the major portion of the contract.

$795.00

ACES Webinar
online
Nashville, TN 37211
800-992-1910
Day 1 8:00 am to 5:00 pm CST
Day 2 8:00 am to 5:00 pm CST
This is a 2 day course
SKU: cv330430 Category: Tag:

Required Books 

.***IMPORTANT REFERENCE MATERIAL INFORMATION

These are semi-open book exams. Not all of the books that are required to prepare for the exams are actually allowed into the exam room.  The following books and documents are allowed into the exam for Parts 1 & 2:  NFPA 70 โ€“ National Electrical Code, 2017,  New Mexico Electrical Code (NMAC 14.10.4), 2011 "http://www.nmcpr.state.nm.us/NMAC">www.nmcpr.state.nm.us/

NOTE: The required document can be viewed and printed at the web address following the title. To be allowed into the exam room, it must be put into a binder. The following books are NOT allowed into the exam for Parts 1 & 2: American Electricianโ€™s Handbook,  Uglyโ€™s Electrical References, 2017 

The following books are allowed into the exam for Part 3: National Electrical Code, 2017

The following books are NOT allowed into the exam for Part 3: American Electricianโ€™s Handbook, 16th edition, Telecommunications Wiring,  Understand and Servicing Alarm Systems,;  Uglyโ€™s Electrical References, 2017; Telecommunications Distribution Methods Manual, 14th; NFPA 75 โ€“ Standard for the Protection of Electronic Computer/Data Processing Equipment, 

Add All Required Books to Cart ($2,230.00)